单选题You have been tasked with installing two SRX 5600 platforms in a high-availability cluster. Which requirement must be met for a successful installation?()A
You must enable SPC detect within the configuration.B
You must enable active-active failover for
题目
单选题
You have been tasked with installing two SRX 5600 platforms in a high-availability cluster. Which requirement must be met for a successful installation?()
A
You must enable SPC detect within the configuration.
B
You must enable active-active failover for redundancy.
C
You must ensure all SPCs use the same slot placement.
D
You must configure auto-negotiation on the control ports of both devices
更多“单选题You have been tasked with installing two SRX 5600 platforms in a high-availability cluster. Which requirement must be met for a successful installation?()A
You must enable SPC detect within the configuration.B
You must enable active-active failover for”相关问题