Large
Small
Medium
Enterprise
System software for the Power 780 server is licensed at which tier?()A、LargeB、SmallC、MediumD、Enterprise
点击查看答案
Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()A、AIXB、IBM iC、LinuxD、VIO Server
A customer is consolidating seven IBM i partitions onto a POWER7 system, using VIO Server to virtualize resources.Which of the following PowerVM editions is appropriate for this customer?()A、IBM i EditionB、Express EditionC、Standard EditionD、Enterprise Edition
Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()A、AIXB、IBMiC、LinuxD、VIO Server
A customer plans to consolidate to high-end enterprise level servers using multiple partitions. They are evaluating an IBM POWER5 solution for their server consolidation environment. Which of the following best describes the value of the IBM solution as compared with the competition?()A、The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.B、The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.C、The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.D、The POWER5 system supports more partitions and has the lowest partitioning overhead.
You need to identify the combinations of the Windows operating system and SQL Server 2005 version that will be the most appropriate for the new R&D configuration, which will include the Research, Parts, and Engineering databases.Which two combinations will be the most appropriate?()A、Windows Server 2003 Enterprise Edition with SQL Server 2005 Enterprise EditionB、Windows Server 2003 Datacenter Edition with SQL Server 2005 Enterprise EditionC、Windows Server 2003 Standard Edition with SQL Server 2005 Enterprise EditionD、Windows Server 2003 Enterprise Edition with SQL Server 2005 Standard Edition
单选题An administrator is planning an upgrade of a major software package on an application server.The software has been tested successfully in a test environment and it is ready to go into production. Which of the following steps should the administrator take next?()A Identify necessary operating system updatesB Implement the changeC Document the changeD Schedule system down time