用车完毕!
主机定速!
备车!
摇铃!
When the ship, its main propulsion device equipped with clutch, arrived at the port and finished with the engine, the correct operation should be______.A.disengaging the clutch firstly, then stopping the main engineB.stopping the main engine firstly, then disengaging the clutchC.stopping the cooling water pump firstly, then stopping the main engineD.stopping the main engine and disengaging the clutch at the same time
点击查看答案
When received the order "Finished With Engine", which of the following operations is wrong?A.stop the L.O pump, S.W pump, jacket water cooling pump immediatelyB.stop the F.O booster pumpC.engage the turning gear, turn the main engineD.open the main engine scavenge air trunk's drain cocks
what does “finished with engine” mean?
“Movement of engine no longer required.” means “______”.A.Stop EngineB.No Engine RevolutionsC.Stand-by EngineD.Finished With Engine
When the movement of engine is no longer required the pilot usually gives the order like this ______.A.Stop engineB.Nothing to portC.Finish enginesD.Finished with engines
Finished with engine!()A、用车完毕!B、主机定速!C、备车!D、摇铃!
备锚,摇“备车”钟。()A、Get anchor ready and ring “Stand by engine”.B、Get anchor ready and ring “Finished with engine”.C、Get mooring ready and ring “Stand by engine”.D、Get mooring ready and ring “Finished with engine”.